GSEC – E&C in association with leading Japanese Companies comes in with the most advanced technologies and experience in establishing successfully working foundries in Seismic zones 5 + in Japan & other global locations. GSEC – E &C is focused on reducing the plant’s environmental footprint while maintaining the priority on safety and short construction time, seeking to design and build an environmentally friendly eco-plant. For the HVAC system in particular, we chose the most advanced technology with outstanding energy efficiency.
The cleanroom uses SWIT, or swirling induction type HVAC, which creates temperature strata inside the cleanroom, and works with rising air currents created by heat-generating equipment to carry airborne dust toward the ceiling. This makes it possible to maintain a steady temperature in the work areas at lower elevations in the room more efficiently, so that the volume of air being supplied can be lower than in conventional HVAC systems. Also, because this allows for air to be supplied at a higher temperature, the chilled-water temperature can also be higher, which contributes to energy savings. Compared to existing systems, the annual energy used is expected to be roughly 47% lower for transport power and roughly 32% lower for heat-source power (*1).
Additionally, this system helps to simplify building construction, so it contributes greatly to a shorter construction process and lower construction costs.
Earthquake-Proof Construction
For our earthquake management we are one of the first semiconductor fab in the world to adopt a hybrid seismic isolation structure. Three types of seismic isolation systems will be designed and will be placed , as per soil and geographical conditions of the proposed J&K Sites , between the building and its foundation, which under such conditions minimize the effect of fine vibrations , allowing us to achieve a stable supply for our customers.
Disaster Management